201 Borough Street_02_Hero

201-211 Borough High Street, London, SE1

  • Full refurbishment and Fit Out of Existing 6 storey office building (Basement to 4th).
  • Demolition of existing roof top plant rooms and construction of new 5th floor office space from Steel Frame, CLT Roof and Structural Glazing facades including new plant deck all without use of cranage.
  • High specification fit out.
  • Full mechanical, electrical and public health installation as CDP element. Installation of condenser and AHU plant to new roof top plant deck and rain / greywater harvesting installations.
  • Installation of new useable roof terraces including extensive green roof, AOV, mansafe and PV Panel installation.
  • Refurbishment of 2 no. existing lifts.
  • Extensive site restrictions requiring installation and operation of hoists for material movements to upper floors.
  • High end commercial office fit out completed in Phased handovers (Basement to 3rd Phase 1, 4th and new 5th Phase 2). 2nd phase constructed while Phase 1 is fully occupied – working with logistical challenges and noisy works restrictions.
  • Extensive bespoke Joinery installations.
  • Working adjacent to a live library building and Royal British Legion.
  • Facade works comprising of installation of new composite windows, bespoke curtain walling, brickwork and architectural metalwork. Extensive facade repairs to existing.
    Extensive coordination and ‘working up’ buildable solutions
  • Working closely with Architect & Client to achieve optimum end use solutions.
Value: £6,100,000
Status : Completed